2-year warranty benefit
Register your KPUY product to apply for eligible warranty benefits when the program launches.
Proposal only. Whether coverage adds two years or totals two years is still being finalized.Follow the installation film, then work through the illustrated guide at your own pace.
Watch installation video View the manual
Check the contents of your kit and prepare a safe place to handle the glass.
Two people should install this door; professional installation is recommended. Inspect glass and parts before work. Keep corner protectors fitted, protect the tub surface, and wear safety glasses, gloves and closed-toe shoes. Never cut or modify tempered glass or lift it by the handle. Complete the finished walls and base first. PDF pp. 2–4, 16.
Safety drawings · PDF pp. 2–4, 16 ↗Drill and bits, screwdriver, level, silicone/sealant, tape measure, soft-head hammer, pencil, knife, 6 mm masonry bit for tile, safety glasses, gloves, carpenter's square, masking tape, hacksaw and metal file. The chart shows ¼ in. (6 mm) and ⅛ in. (3 mm) HSS bits; follow the specific fixing drawing for the surface and fastener. PDF p. 3.
Tool chart · PDF p. 3 ↗
Use the A–R parts table: A guide block; B threshold; C wall channel; D magnetic strips (2); E moving glass; F handle; G cushioning strip; H anti-jump parts (2); I rollers (2); J wall brackets (2); K upper rail; L glass brackets (2); M F-strip; N waterproof strip; O fixed glass; P U-strip; Q threshold connectors (2); R template. Check hardware packs aa–cc. PDF pp. 5–6.
Assembly & parts list · PDF pp. 5–6 ↗Follow the drawings for your door handing. Page references count from the PDF cover.
The manual specifies a 55–60 in. opening and 60 in. height (p. 2). Measure W1 at the top and W2 at the bottom; both must fit the kit. Check the threshold is level. The original rail-cut detail on p. 7 gives W1 minus 1 3/16 in.
Choose the left- or right-hand drawing. Place template R 25 mm (1 in.) from the base edge and level it. On the fixed-panel wall, mark only bracket J holes as shown. No numeric out-of-plumb allowance is specified.
Open original drawing ↗
Move active panel E inside before installing fixed panel O, so access is not blocked. Fit the two rollers I with their illustrated washers and gaskets, facing outside.
Use p. 10 for left-hand or p. 11 for right-hand orientation. The manual identifies the moving glass as coated on both sides. Keep it on a protected surface while preparing the rail.
Open original drawing ↗
Follow p. 12 to anchor wall brackets J and mount upper rail K; it specifies 5 × 35 screws at the wall connector. Tighten the four Allen screws by hand and check both rail ends are level. Prepare fixed glass O using the strips shown on p. 13.
Match the waterproof and U-shaped strips to the p. 13 drawing and parts table. Retain the illustrated 0.59 in. strip offset and turn the film-sticker side inward. Mount fixed glass outside using brackets L and the gasket order on p. 14.
Open original drawing ↗
Locate the bottom guide supplied with your S9711D door and compare it with guide A in the original drawing on PDF p. 15. Check that the guide and its hardware match before fitting.
If your guide differs from the manual or video, send KPUY Support photos of the guide, hardware and kit label to confirm the fitting method before drilling or securing it. Do not combine methods for different guides. Hang the moving door only after the correct guide fitting is confirmed and complete.
Open original drawing ↗
Once the correct guide is secured, follow p. 16 with a second person: moving panel E goes inside, its bottom enters the guide, and rollers I rest on rail K. Do not fit or lift by the handle at this stage.
Use the illustrated eccentric adjustment to align the panel, secure the roller with the indicated 5 mm Allen key and replace its cover. Fit and adjust anti-jump parts H using p. 17. If alignment remains poor, contact KPUY Support before further adjustment; do not force the glass.
Open original drawing ↗
Fit the magnetic and water-retaining strips in the locations shown on p. 18. Trim only the indicated strip section. Use the left-hand channel drawing on p. 19 or the right-hand drawing on p. 20.
The channel drawings on pp. 19–20 specify three ¼ in. (6 mm) holes and ST4 × 35 screws. Keep channel C plumb and fit the magnetic strip shown in the drawing. Verify the mating strips meet without forcing the glass.
Open original drawing ↗
Fit handle F with every supplied rubber gasket to protect the glass. Measure threshold span x from the stationary-glass edge to the opposite wall using the drawing for your handing.
Cut threshold B to the illustrated span, insert both Q connectors and secure the threshold and connectors with the specified glass adhesive. Page 22 is the left-hand example; p. 23 is the right-hand example.
Open original drawing ↗
Clean all sealing surfaces and check the door closes tightly and moves smoothly. Apply silicone along channel C, threshold B, the fixed-glass bottom and waterproof strip N as shown.
Allow 24 hours for the silicone to cure before use. Preserve the glass corner protectors and manual for future adjustment.
Open original drawing ↗
S9711D · PDF · 24 pages · English
Quick checks for fit, movement and sealing.
PDF p. 2 specifies 55–60 in. W × 60 in. H with ¼ in. (6 mm) glass. Both left- and right-hand bathtub arrangements are illustrated. Verify the kit label before cutting.
Check that the rail is level and the wall is plumb. Follow the eccentric roller adjustment shown on PDF p. 16. If the door still does not align, contact KPUY Support with photos and your opening measurements before further adjustment. Do not force the glass.
Compare your supplied guide with PDF p. 15. If the guide or its hardware differs from the manual or video, send KPUY Support photos of the parts and your kit label before drilling or securing it. Use only the fitting method confirmed for your guide.
Match each part’s shape and location to the exploded drawing and parts table on PDF pp. 5–6, then check the relevant step drawing. If a label is unclear or a part does not match, send a photo to KPUY Support before fitting it.
Check strip orientation (p. 18), the channel (pp. 19–20), threshold end connectors Q (pp. 22–23) and sealing locations (p. 24). The final page requires a 24-hour cure.
Tell us your model, S9711D, and where you need a hand. Installation help is open to every KPUY owner.
Phone support · Mon–Fri, 9am–5pm PST · WhatsApp number ownership is pending confirmation.
KPUY Owner Benefits
Proposed member benefitsStart with a free KPUY account. Explore the warranty and savings benefits we're planning for owners.
Register your KPUY product to apply for eligible warranty benefits when the program launches.
Proposal only. Whether coverage adds two years or totals two years is still being finalized.Save 10% on eligible KPUY products for your future home projects, purchased directly from KPUY.
Accessories excluded. Final program terms and eligibility are pending.Create or sign in to your KPUY account. Product registration and proposed member benefits are coming later. Joining does not activate a warranty or discount.
Proposed benefits for internal preview. Final terms and eligibility are pending. No warranty is activated or discount issued on this page.